prefabAUS 2017 Conference

Growing. Innovating. Revolutionising. 

11 - 13 September 2017  |  The Glasshouse - Olympic Boulevard, Olympic Park Melbourne, Victoria

prefabAUS 2017 Conference

 

TThank you to everyone who completed our online Conference Survey. The feedback received has provided us with a great insight into what you liked best, what we can improve,  and what you’re looking for in 2018.

We’d like to announce the winners of the survey competition:

The complimentary prefabAUS 2018 Conference registration was won by Damien Lipp from Dindas

The 3 x dozen mixed wine cases were won by David Heath from ARC CAMP.H; Joyce Ferng from AECOM; and Steven Janssen from Laing O’Rourke

Congratulations to the winners!

 

 

Conference Gallery

Day One

Day Two



 

Conference Speakers

International Keynote Speaker

Confirmed Speakers

Industry Leaders Panel

 

 

Conference Program

 

The experts who produced the Modular Construction Code will speak on why it was needed and how it was developed, along with insights into its design and construction elements. In addition, all conference delegates will receive a digital copy of the final Code handbook – the first time it will be released.

 

 

 

 

Site Vist Program

 
DSF_0338small.jpg

Dynamic Steel Frame - Factory Visit

Dynamic Steel Frame designs and manufactures light gauge steel wall framing for roof trusses; floor cassettes for multi-residential, education and commercial projects; facades and a range of other applications. They also recently commenced manufacturing bathroom pods.


ImpresaHouse_Wall01.png

Impresa House - Factory Visit

Utilising world leading technologies and automation equipment, Impresa House produces precision manufactured panelised wall frames, both open and closed; floor cassettes and roof elements at its state of the art manufacturing facility based in Derrimut, Victoria.


20170817_081610.jpg

Oakleigh South Childcare Centre: Australia’s first childcare CLT project

Oakleigh South Childcare Centre is Australia’s first cross-laminated timber (CLT) childcare centre. Constructed using approximately 260 XLam CLT panels (delivered in 10 x 40’ containers), it was installed in a little over ten days with an average team of four excluding crane crew. This is a Hume Property project, with the Atelier Projects as the main contractor. Works are still underway with completion expected later in the year. 


IMG_6399.JPG

Tullamore: Mirvac’s three-level panelised townhouses project

These townhouses are part of Mirvac’s 800 lot Tullamore estate project in Doncaster. The floor and wall panels are supplied by FutureFit’s panelised building system.  Floor cassettes for this project are typically around six metres by 2.4 metres in size, and the panelised walls are up to three metres high and six metres long. This is a live site, with a bank of five townhouses currently being installed.

 
 
 

Conference Sponsors

Sponsorship opportunities are available. For a copy of the Sponsorship Prospectus please contact Brooke Adams, National Events Executive, on email brooke.adams@prefabaus.org.au.

Premium Partners

Partners

Supporters

Design Media Partners

Publishing Partner

Industry Media Partner